Rex Minerals Pty Ltd – Hillside Copper Mine: Mining Lease Proposal and Management Plan
In August 2013, Rex Minerals Pty Ltd submitted its Hillside mining lease proposal to Government. This consisted of a main report and a number of appendices.
Links to the Main Report and Appendices are as follows:
Mining lease proposal document – main report
Mining lease proposal document – appendices
- Section 5 Appendices – Description of the existing environment: Appendices 5.1 to 5.10 (.zip 40.9Mb)
5.1-A: Socio-economic baseline report
5.3-A: Traffic and transport impact assessment
5.5-A: Visual amenity plan
5.6-A: Hillside mine pre-construction noise monitoring
5.6-B: Hillside mine road diversion – road traffic noise assessment
5.6-C: Dust and odour impact assessment report
5.8-A: Waste rock sampling
5.8-B: Waste rock characterisation report
5.9-A: Surface hydrology report
5.10-A: Hydrogeology report - Section 5 Appendices – Description of the existing environment: Appendices 5.11 to 5.13 (.zip)
5.11-A: Marine baseline report
5.11-B: Marine potential contaminants report
5.12-A: Flora baseline report
5.12-B: Flora supplementary report
5.13-A: Fauna baseline report
5.13-B: Fauna supplementary report
5.13-C: Quarterly bird surveys report - Section 5 Appendices – Description of the existing environment: Appendices 5.14 (.zip)
5.14-A: Land capability report
5.14-B: Mine rehabilitation (Characterisation of overburden) - Section 5 Appendices – Description of the existing environment: Appendices 5.15 (.zip)
5.15-A: Preliminary Aboriginal cultural heritage investigation
5.15-B: Aboriginal cultural heritage investigation – stage 2
5.15-C: Aboriginal cultural heritage investigation – supplementary stage 2
5.15-D: Aboriginal heritage collaboration agreement - Section 6 Appendices – Description of the proposed operations (.zip)
6.2-A: Reserve statement Hillside project
6.5-A: Groundwater investigations report
6.5-B: Groundwater injection disposal modelling report
6.6-A: Operational noise assessment
6.7-A: Integrated waste management tailings storage facility design report - Section 7 Appendices – Stakeholder consultation (.pdf 2.3Mb)
7.4-A: Community Consultative Group Terms of Reference
7.4-B: Hillside project government consultation minutes
7.4-C: Community perceptions survey report - Section 8 Appendices – Environment and social impact assessment (.pdf 30.4Mb)
8.1-A: Socio-economic impact assessment
8.3-A: Construction noise and vibration management plan
8.3-B: Hillside mine blasting impact assessment
8.3-C: Hillside mine mobile plant headlight line of sight assessment